Over 100 5-star reviews on
Easy Kitchen Remodeling in Monmouth County, NJ
Create a timeless, premium-looking kitchen space where you can connect with the entire family
- 100+ kitchens remodeled
- Licensed, bonded, and insured
- Clear daily communication
- Fast, reliable turnaround times

Why all Renewal Kitchens start with a showroom consultation
Before we send a designer into the field, we want to understand your style, scope, and budget range. Our showroom lets you react to real materials, align on direction, and avoid wasted time on kitchen projects that were never a fit.
When you’re ready for a full plan, our kitchen design package covers the complete design, final measurements and a proposal priced from that design, not from guesses.
Not ready for a full remodel? A kitchen refresh, such as cabinet refacing, new countertops or new lighting, can often be finished in under two weeks.
Make your kitchen the place to be, with:
- Premium countertops (granite, quartz, and more)
- Light-filled open-concept layouts
- Expansive kitchen islands with seating
- Custom cabinetry and organization solutions
- Gourmet appliances and modern upgrades
- Walk-in pantries and storage solutions
- Cozy breakfast nooks and coffee stations
- Seamless kitchen-to-living room transitions
Where Practical Function Meets Personal Style
Frequently Asked Questions
Most kitchen remodels take about 3 to 4 weeks, but the exact timing depends on the scope of work and whether permits are required. We’ll walk you through the schedule in advance so you know exactly what to expect; no surprises, no radio silence.
For countertops, quartz is the go-to for most of our homeowners; it’s durable, low-maintenance, and looks beautiful without needing to be sealed like granite. For cabinets, we recommend solid plywood construction with soft-close hardware, built to last and easy to clean.
Because full kitchen planning takes real time. We use the package to invest serious design work into serious projects.
Only for homeowners who want a fully accurate plan and proposal. If you’re just exploring ideas, you’re welcome to visit our showroom first, no commitment needed.
These are other areas we serve:
Kitchen Remodeling in Matawan, NJ
Kitchen Remodeling in Morganville, NJ
Kitchen Remodeling in Holmdel, NJ
Kitchen Remodeling in Marlboro, NJ
Kitchen Remodeling in Colts Neck, NJ
Kitchen Remodeling in Middletown, NJ
Kitchen Remodeling in Hazlet, NJ
We’re transparent from day one. We’ll go through pricing in detail, explore material options that fit your priorities, and help you build in a 20–30% cushion for unexpected surprises.
The goal isn’t to upsell you; it’s to help you make confident, informed decisions that feel right for your family and finances.
After design-package commitment and showroom direction are in place.
Yes, as part of our kitchen refresh service: new doors, drawer fronts and glides on your existing cabinet boxes. Refacing and new countertops can often be finished in under two weeks.
A Pricing Guideline For Your Kitchen Remodel In NJ
380 Sq. Ft. Kitchen Remodel in Manasquan, NJ
- Demolishing old cabinetry, countertops, soffits, and breakfast bar
- Framing and installing a new wall extension with recessed header
- Rerouting electrical, gas, and plumbing for new kitchen layout
- Installing recessed lighting, under-cabinet lights, and sconces
- Adding new shaker-style cabinetry and quartz countertops
- Installing ~380 sq. ft. of LVP flooring and tile backsplash
- Completing with fresh paint, moldings, and trim
This kitchen remodel was quoted at $90,000, including a $1,382 allowance for header installation. The most expensive item was the countertop and cabinets, priced at $30,000.
350 Sq. Ft. Kitchen Remodel in Wall, NJ
- Demolishing cabinetry, countertops, and a 13 ft separation wall
- Installing new windows and relocating an existing slider
- Installing a 22 ft support beam and reinforcing wall structure
- Extending plumbing, gas, and drainage for new layout
- Installing hardwood flooring, then sanding and staining to match
- Installing Calacatta Anava quartz countertops and an 8 ft island
- Running new electrical and adding extra lighting
- Painting new cabinetry for a smooth, finished look
This kitchen remodel was quoted at $75,000, including all approved change orders. The most expensive item was the quartz countertops, costing around $7,000–$8,000.
500 Sq. Ft. Kitchen Remodel in Holmdel, NJ
- Demolishing tile flooring, cabinetry, and baseboard moldings
- Removing an 8 ft laundry wall and capping off plumbing
- Installing structural king jacks and a recessed 15 ft header beam
- Hanging new drywall and painting ceiling and walls
- Installing custom cabinetry and a new 8 ft island
- Laying ~500 sq. ft. of waterproofed tile flooring
- Installing quartz countertops and 60 sq. ft. of backsplash
- Finishing with trim, kick plates, and sealants
This kitchen remodel was quoted at $68,000, with the most expensive item being the cabinets and countertops, priced at $22,500.
Our Design-Build Kitchen Remodeling Process
One team designs and builds your kitchen, and you’ll see every cost itemized before the work starts.
- Clearer pricing before major decisions are made
- Better planning around layout, materials, and scope
- Fewer surprises once the project begins
- A more efficient path from idea to final proposal

1
Consultation

2
Estimate

3
design and full-scope pricing
Built on Faith, Integrity, and Results
Your Home Deserves A Team That Honors It








I highly recommend Renewal Solutions. They recently finished my kitchen renovation. This was the third project I have hired them for. They are creative, neat, highly skilled and customer-focused. The crews are talented craftsmen who take obvious pride in their work.
I trusted them completely with access to my house… important as I had to unexpectedly be away for a month, and RS kept in constant contact with me. As in any reno, there were “surprise” issues that cropped up. RS lived up to its name as these issues did require solutions!
They truly go the extra mile to make sure their customers are completely happy. I found their costs to be very competitive. But, their care for their customers makes them stand out.
m
Jim and I are thrilled with our new kitchen thanks to Renewal Solutions.
Over the years we’ve dealt with contractors but no one like Joey and Tommy that made us feel like family. Their crews are true craftsmen and they exceeded our expectations at every turn.
We have recommended Renewal Solutions to all our family and friends and plan for them to do other work for us. We are loving our new kitchen.
s
I can’t say enough about the professionalism and cleanliness when Renewal Solutions was performing our kitchen renovation.
They started the project on time and went above and beyond to make sure we were happy during the entire process. The project was done in a shorter timeframe than we thought originally and Tommy and Russ stopped by daily to make sure the renovation was running smoothly.
Anyone looking for renovation should definitely consider Renewal Solutions. We chose them over other contractors because their pricing was more in line with what our budget allowed, and I love the fact that they are all first responders.
Always an added bonus to give business to those that risk their lives to help others.

Google Guaranteed Remodeling You Can Rely On
Meet Thomas: A Different Kind of Contractor
Why Families Trust Renewal Kitchen & Bath
A Remodel That Moves at Your Speed
A Kitchen That Fits Your Life
A Team You’ll Trust Like Family
Create the Kitchen Everyone Longs to Come Home To
Our production calendar is limited. Book your consultation today!